SHORT Rate of useful instructions EVENTSET PMC0 PM_IOPS_CMPL PMC1 PM_INST_DISP PMC2 PM_IOPS_DISP PMC4 PM_RUN_INST_CMPL PMC5 PM_RUN_CYC METRICS CPI PMC5/PMC4 Useful instr. rate PMC4/PMC1*100.0 Useful uops rate PMC0/PMC2*100.0 LONG Formulas: CPI = PM_RUN_CYC / PM_RUN_INST_CMPL Useful instr. rate = PM_RUN_INST_CMPL/PM_INST_DISP*100.0 Useful uops rate = PM_IOPS_CMPL/PM_IOPS_DISP*100.0 -- This groups measures how many of the dispatched instructions and internal operations (uops) are acutally completed. These metrics show the speculatively dispatches instructions compared to the completed instructions.