cc-metric-collector/collectors/likwid/groups/power8/USEFUL.txt

25 lines
614 B
Plaintext
Raw Normal View History

2021-03-25 14:47:10 +01:00
SHORT Rate of useful instructions
EVENTSET
PMC0 PM_IOPS_CMPL
PMC1 PM_INST_DISP
PMC2 PM_IOPS_DISP
PMC4 PM_RUN_INST_CMPL
PMC5 PM_RUN_CYC
METRICS
CPI PMC5/PMC4
Useful instr. rate PMC4/PMC1*100.0
Useful uops rate PMC0/PMC2*100.0
LONG
Formulas:
CPI = PM_RUN_CYC / PM_RUN_INST_CMPL
Useful instr. rate = PM_RUN_INST_CMPL/PM_INST_DISP*100.0
Useful uops rate = PM_IOPS_CMPL/PM_IOPS_DISP*100.0
--
This groups measures how many of the dispatched instructions and internal operations (uops) are
acutally completed. These metrics show the speculatively dispatches instructions compared to the
completed instructions.